Skip to main content
Our News

Camino Intercepts High-Grade Copper with 76.2m at 0.88% Cu including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

By 10 June 2026No Comments

Vancouver, Vancouver, June 10, 2026 – Camino Minerals Corporation (TSXV: COR) (OTC: CAMZF) (“Camino” or the “Company”) is pleased to announce the exploration results from Phase 2 of the recent drilling campaign at its Costa de Cobre project (“Costa de Cobre” or the “Project” (formerly known as “Los Chapitos”(1))) in Peru. Camino completed five drill holes along the Diva trend corridor, where drilling activities focused on the Adriana target with the objective of expanding the known mineralized body and improving the understanding of the scale and continuity of the mineralized system. The maximum drill hole depth was 260 metres and all five drill holes intercepted strong copper mineralization and spanned a strike length of approximately 400 metres.

READ MORE